Remove Lien Remove Railroad Remove Subcontracting
article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

Funds may be provided for the construction and/or improvement of water lines & wastewater facilities, sewer lines, sewage treatment facilities, roadways, natural gas-line services, electric power services, railroad spurs, lighting, sidewalks and alternative power sources such as solar. Railroad Spurs. Natural Gas-Line Services.

Income 108
article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

The private sector participant finances 50 percent of the project cost and takes a first lien on assets pledged as collateral. The SBA takes a second lien on assets and finances up to 40 percent of the project cost, up to $1 million in some cases. Borrowers inject 10 percent in the form of cash or equity in real estate.

Income 75
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build).

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build).