Remove Life Cycle Remove Modeling Remove Negotiation Remove Overhead
article thumbnail

Developing a Job Order Contracting Program

Building Information Management

Construction tasks not included in the unit price book may be negotiated. The difference between the facility owner’s cost based on the UPB and the contractor’s cost is represented as a coefficient which is used as a multiplier that covers the contractor’s overhead and profit as well as any adjustment between the UPB and the local prices.

article thumbnail

Development of the Job Order Contracting (JOC) Process for the 21st Century

Building Information Management

Construction tasks not included in the unit price book may be negotiated. The difference between the facility owner’s cost based on the UPB and the contractor’s cost is represented as a coefficient which is used as a multiplier that covers the contractor’s overhead and profit as well as any adjustment between the UPB and the local prices.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

The Contractor shall furnish as part of its overhead cost, included in the coefficient, all necessary protective equipment, concrete mixing boxes, water barrels, wheelbarrows, hoes, shovels, tools, mortar boards, ladders, portable scaffolding, shop tools, hand tools, shop equipment, and fabricating items customary to the trade, etc.,

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

design/negotiate/build). design/negotiate/build). 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 54 36 Building Information Modeling Exhibit. 01 90 00 Life Cycle Activities.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

design/negotiate/build). design/negotiate/build). 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 54 36 Building Information Modeling Exhibit. 01 90 00 Life Cycle Activities.

article thumbnail

Public Law 111-308 – Federal Buildings Personnel Training Act – FBPTA – CORE COMPETENCIES

Building Information Management

o O perating, Maintaining and Testing Life Safety. o Total Cost of Ownership (TCO) o Life-­?Cycle Cycle Assessment (LCA). o Determine costs/pricing structure (labor, materials, overhead, etc.). 2010, Model Energy Code, ASHRAE Standard 135-­?2008, Cycle Cost Analysis (LCCA) for. M echanical Systems.