Remove Negotiation Remove Railroad Remove Schedule
article thumbnail

Active Interference Wins Skee Ball Points and Precludes Enforcement of A “No Damages for Delay” Clause

Best Practices Construction Law

Missouri Pacific Railroad Company , 668 F.2d In that case, the Owner issued a notice to proceed to the bridge superstructure contractor with knowledge that substructure work would not be completed on schedule. The real lesson is to make sure to review your contract for these types of provisions and try to negotiate the terms.

Claims 48
article thumbnail

COVER STORY: 2013 Business Facilities Rankings Report – Metro And Global Rankings

Buisness Facilities Contributed Content

The office building is scheduled for completion by spring 2015 with the residential complex following in the summer. The European Union has been in intense negotiations with Beijing in recent weeks to try to resolve the trade dispute, and the latest reports say a tentative agreement has been reached.

Metro 110
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

LOCATION FOCUS: California Dreamin’ – A Rebound Fueled By New Energy

Buisness Facilities Contributed Content

Based on our current project schedule, it is anticipated that the project could break ground toward the end of 2013. If the Department of the Interior approves the project as meeting federal guidelines, the next step in the process would be negotiating a contract with the Office of California Governor Jerry Brown.

article thumbnail

Feature Story: Shovel-Ready Sites – Fired Up, Ready To Go

Buisness Facilities Contributed Content

The 15,000-square-foot-facility is scheduled to open in the fall. Construction is scheduled to begin this year and will result in a 1.5 The 166,494-square foot distribution center is scheduled for completion by September 2014. This is the fifth Baldwin County site to earn this designation.

Site 66
article thumbnail

Logistics: On the Road, Water or Rails…or in the Air — AGAIN

Business Facilities

Chicago is the nation’s rail hub that connects six of the seven class one railroads. DuPage County is accessible to the 52 railroads in Illinois, which makes the area the nation’s largest rail gateway, providing access to every state in the continental U.S. Section 5 is scheduled to be finished by June 2017.

Roads 41
article thumbnail

LOCATION FOCUS: Texas: Big Heart, Country, Business

Buisness Facilities Contributed Content

The firm has signed new 20-year contracts with two large Japanese power companies to export liquefied natural gas from the facility and is reportedly in negotiations with a U.S. For companies requiring rail, Greenville can be accessed by virtually every major railroad line.

Texas 45
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 20 List of Schedules. 00 31 13 Preliminary Schedules. Preliminary Project Schedule. Preliminary Construction Schedule. 00 43 73 Proposed Schedule of Values Form. 00 43 83 Proposed Construction Schedule Form. 00 43 86 Proposed Work Plan Schedule Form. design/negotiate/build). Requirements.