Remove Overhead Remove Plans Remove Travel
article thumbnail

How to Create an Independent Government Cost Estimate

Job Order Contracting

Technical planning and professional procurement team collaboration and adherence to robust best management practices are needed to mitigate financial and environmental waste. Contractor profit and overhead are NOT included. #4. Use in early planning stages of a contract service when specific tasks/elements are not yet known.

article thumbnail

2020 Guide to Construction Cost Estimating

Job Order Contracting

The base rate does not include overhead and profit, however, can be added if needed. In addition, highly specialized subcontract items may require travel and per-diem expenses for mechanics. Overhead and profit markups are not included in the pricing, but can be added electronically to the database as needed. General Conditions.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

The Force Reveals Plans for New Home

Construction Equipment

George Lucas' highly-anticipated Lucas Museum of Narrative Art at Exposition Park in Los Angeles has received approval from the Los Angeles Planning Commission who signed off on the plans Thursday.

article thumbnail

Make Crane Safety Priority One!

Constructonomics

This post was written by SPANCO, an industry leader in overhead cranes since 1979. Overhead and gantry cranes have three axes of directional travel: vertically in the direction of the hoist and load hook, laterally along the path of the trolley, and forward and back along the path of the bridge. THE EQUIPMENT.

Safety 158
article thumbnail

Proposal Pricing Strategies: How Much are You Selling that Watermelon For?

Help Everybody Everyday

Each weekend they travel to the country and buy watermelons from the local farmers at 50 cents per melon. Depending on your client, travel may be considered a reimbursable expense. Your loaded rate is the (Actual Rate + (Actual Rate * Overhead %) + Fee. Most clients will pay all or a portion of your audited overhead costs.

article thumbnail

Digger’s Top Ten blogs 2012

Digger Blog

It featured a Terex Franna crane that had struck an overhead gantry somewhere in Perth, Western Australia. Entering the top 3 now with a post from March, on some of the new models Cat were planning to launch at the upcoming Intermat show the following month. Click here to read the full post. Click here to read the full post.

Modeling 108
article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

coefficient (reference table of allowable overhead). Contractor’s UPB estimate of tasks and quantities of labor, materials, and equipment to do the work, plans and specifications, and project timeline. The UPB costs should NOT include contractor overhead and profit. If the JO and plans do not agree the JO prevails.

Contract 100