Construction Cost Optimization
Job Order Contracting
NOVEMBER 15, 2024
The base rate usually does not include overhead and profit, however, can be added later to ensure data integrity. Overhead and profit markups are not included in the pricing, but can be added electronically to the database as needed. General Conditions General overhead and profit can be added by percentage if desired.
Let's personalize your content