Remove Overhead Remove Roads Remove Schedule Remove Software
article thumbnail

What are Preliminaries in Construction Contracts?

Lets Build

The easiest way to define preliminaries in construction is as a group of items necessary for a construction company or contractor to complete a project but that won’t become a part of the finished work—site overhead, scaffolding, powering the site, etc. Free eBook: Guide to a digitised QHSE organisation. Planning and design costs.

Contract 144
article thumbnail

The high cost of low maintenance

BD+C

In regard to proactive maintenance versus reactive maintenance, the former includes regularly scheduled maintenance, which can lead to the early detection of issues and problems. As for the latter, maintenance is only provided when serviceability is compromised. The total estimated cost of the repair was $700,000.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

What Is Estimate | Types of Estimate |Requirement Data for Estimation |Advantage of Estimate | Disadvantage of Estimate | Types of Cost Estimation

CivilJungle

These prices can be derived from the rate book’s PWD schedule or the rates can be figured out using the “analysis of rate method”, method. Road and Highways. Overhead Water Tank. #2. Analysis of rates, if rates are not as per the schedule of rates or for the non-scheduled items. schedule, timeline, etc.)

article thumbnail

Can We Make Home Building a Little Less ‘Interesting?’

Pro Builder

Blame it on the software or blame it on the users. Yes, it’s time to get your plans, specifications, and schedule on a portal, if you haven’t already. Almost never is the true total cost of each approach thoroughly measured, including indirects, overheads, and cycle time. A second deficiency is the measurement of variance.

Overhead 105
article thumbnail

DebunkTheBIM: Breaking down the doors to construction modelling.

DebunkTheBIM

I stated before, how I believed there were no decent construction modelling software–applications available for the AEC market. 1 comment: aactionoverhead November 28, 2011 12:00 AM Garage austin, garage door austin, garage door austin texas, garage door repair austin, garage doors austin, garage doors austin tx, overhead door austin.

article thumbnail

What to Do If the Concrete Cube Fails After 28 Days?

CivilJungle

The ensuing are the immediate concrete cube trial failure explanations, Wrong Mix Poured The concrete blend scheduled isn’t the consented combination strategy for that individual strength. Also, read: How to Calculate Staircase | Concrete & Bar Bending Schedule (BBS) | Staircase Reinforcement Details. Like this post?

article thumbnail

A glossary of terms with reference to Construction Cost Estimating

Construction Cost Estimating

A building, plant, road, reservoir, etc. See also Overhead, Indirect cost. See also, Overhead, General & Administrative Cost, Distributable. Overhead - In business, overhead or overhead expense refers to an ongoing expense of operating a business; it is also known as an "operating expense."