article thumbnail

Beware of Using Assemblies for Job Order Contracting

Job Order Contracting

Each aspect, such as materials, labor, equipment, and overhead, should be itemized separately. Adjustments for Site Conditions: Consider any site-specific conditions that may affect costs and make appropriate adjustments. Overhead and Profit: Factor in overhead costs and profit margins using the establish/accepted coefficient.

Contract 245
article thumbnail

What Certifications Does A Crane Need To Operate On Construction Sites?

Construction Marketing

Crane certifications are crucial for construction site operations due to their critical role and potential risks. Promoting safety in construction sites involves ensuring operators understand standard procedures, equipment inspections, load calculations, and hazard identification.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

How to Create an Independent Government Cost Estimate

Job Order Contracting

The IGCE consists of the anticipated costs to include direct costs (labor, products, equipment, travel, and transportation), indirect costs (burden on labor such as fringe benefits and labor overhead), material overhead, general and administrative (G&A) expenses, and profit. Contractor profit and overhead are NOT included. #4.

article thumbnail

Hilti Unveils Semi-Autonomous Overhead Drilling Robot, Called Jaibot

Construction Junkie

Hilti , known for its wide selection of power tools and fastening applications for the commercial construction industry, recently took a step outside the box when they announced the release of an exoskeleton to help relieve the bodily toll overhead work takes on workers. courtesy of Hilti. courtesy of Hilti.

article thumbnail

6 Dangers Of Falling Debris In Construction Sites

Construction Marketing

In most cases, the contractor, subcontractor, or site owner will be held responsible. If the construction company fails to keep the site safe, they could face liability. Any falling object, material, or tool can be fatal, especially on construction sites. How Accidents Happen Due To Falling Debris.

Site 156
article thumbnail

Creating a JOC Coefficient?

Job Order Contracting

General / Prime Contractor Overhead. Site cleanup. Transportation of contractor’s personnel to, from, and within the job site. Labor (Both during Normal Work Hours and Outside of Normal Work Hours). Materials. Equipment. Subcontractor costs. Subcontractor mark-ups. General / Prime Contractor Profit and risk. Supervision.

Insurance 264
article thumbnail

Rethinking Job Order Contracts

Job Order Contracting

The coefficient generally must include all project general conditions as described in the contract, including but not limited to supervision, overhead and profit. Some contractors develop coefficients by analyzing the unit prices in the Unit Price Books and comparing them to historic and anticipated actual costs, plus overhead and profit.

Contract 258