Remove Railroad Remove Roads Remove Schedule
article thumbnail

Construction of World Trade Centers

The Constructor

In gaining approval for the project, the Port Authority of New York and New Jersey agreed to take over the Hudson & Manhattan Railroad which became the Port Authority Trans-Hudson (PATH). The original World Trade Center was designed by Minoru Yamasaki in the early 1960s using a tube-frame structural design for the twin 110-story towers.

Concrete 127
article thumbnail

The evolution of fluid-applied membranes

Construction Specifier

The ability of cold fluid-applied membranes to be installed over ‘green’ concrete is another advantage in regard to the ever-shortening construction schedule. It was commonly used in roads, sidewalks, and the preservation of railroad ties by 1865. Liquid-applied waterproofing materials.

CSI 98
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

FEATURE STORY: Racing To Be Ready – U.S. Ports Prepare for Post Panamax Era

Buisness Facilities Contributed Content

The 50-foot deep container berth was completed in 2012, two years ahead of its original schedule. started seeking city and state approval for its planned 70-acre intermodal facility in Southwest Baltimore, putting the project on schedule to handle increased cargo from the Port of Baltimore beginning in 2015.

article thumbnail

INDUSTRY FOCUS: The Process of Food

Buisness Facilities Contributed Content

What may have otherwise demanded an hour can be accomplished in less than ten minutes, taking a strain off most families and individuals with tight schedules. million of infrastructure (roads, water, sewer, lighting and a railroad siding) was constructed at no cost to local taxpayers. Using the IDA and Empire Zone program, $3.3

article thumbnail

LOCATION FOCUS: California Dreamin’ – A Rebound Fueled By New Energy

Buisness Facilities Contributed Content

During the past several months, City staff has been working with representatives from Rothbart Development to coordinate the environmental and permitting approval process for the Super Wal-Mart project that is proposed to be constructed on a 28-acre site located at the southeast corner of East Main Street and Montara Road.

article thumbnail

Federal Real Property Regulations (FAR / FMR)

Building Information Management

Ordinary maintenance means routine recurring work that is incidental to everyday operations; preventive maintenance means work programmed at scheduled intervals. Service levels are based on the effort required to service space for a five-day week, one eight-hour shift schedule.

article thumbnail

Federal Real Property Regulations (FAR / FMR)

Building Information Management

Ordinary maintenance means routine recurring work that is incidental to everyday operations; preventive maintenance means work programmed at scheduled intervals. Service levels are based on the effort required to service space for a five-day week, one eight-hour shift schedule.