Remove Regulation Remove Sewer Remove Zoning
article thumbnail

Can Looser Zoning Rules Help the Housing Shortage? Biden Thinks So

Pro Builder

Can Looser Zoning Rules Help the Housing Shortage? President Biden’s infrastructure plan will set aside $5 billion for a grant program aimed at tackling “exclusionary” zoning laws that inflate housing costs. Biden Thinks So. cbroderick. Thu, 04/08/2021 - 10:28. and Austin, Texas. Zandi is the chief economist of Moody’s Analytics.

Zoning 98
article thumbnail

Revealing the Past: The Importance of Property Surveys

Wolgast Corporation

This helps you know possible extra costs to bring in utilities, or the fact that you must have a well and septic rather than city water and sewer, and if the position/location of your building is conducive to where the lines are located.

Sewer 112
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

What Is Soil Vent Pipe | How Does Soil Stack Pipe Works | Soil Vent Pipe Material | Types of Plumbing System

CivilJungle

The wastewater in the building should be properly removed through the pipes to the septic tanks and sanitary sewer. The function of the soil vent pipe is to convey the wastewater and the solid waste or human excreta to the soil drain or sewers. Internal Soil Pipe Vent Regulations. Internal Soil Pipe Vent Regulations.

article thumbnail

Pennsylvania Incentives and Workforce Development Guide

Business Facilities

The funds may also be used for site preparation activities and installation of infrastructure, including but not limited to, sewer, water, storm water, utilities and telecommunications, both on site and as needed to bring service to the site. It is a companion program to the Keystone Innovation Zone (KIZ) program.

article thumbnail

Rain check: How green roofs manage stormwater runoff

Construction Specifier

where the city is susceptible to the negative impacts of stormwater runoff and sewer overflow events, managing stormwater runoff is critical for protecting public health, the environment, and the citys infrastructure. The Districts Stormwater Management Regulations stipulates construction sites achieve retention of the rainfall from a 1.2-inch

Green 52
article thumbnail

Industry Focus: Food Processing – The Process Of Consistency

Business Facilities

As a designated Foreign Trade Zone (FTZ), Oswego County is designed for the convenient and cost effective production of goods. All preliminary work such as extending utilities, rail, water and sewer is complete at both sites which are “ready to go and ready to market.”. Many food processing facilities require water for processing.

article thumbnail

Food Processing: Generating Growth for Good Eats

Buisness Facilities Contributed Content

Its stable marketplace offers competitive energy prices, streamlined regulations and a low-risk investment climate. The Park offers an expandable 50,000-square-foot shell building and land sites ranging from 30 to 65 acres and is zoned light industrial. It is served by the New Castle municipal water and sewer utility.

Indiana 40