Remove 2002 Remove Consulting Remove Modeling
article thumbnail

Characteristics of Strategic Collaboration and Efficient Construction Project Delivery

Job Order Contracting

Conceptual model of partnering and alliancing. Development of a practical model of partnering for construction. Application of ANP in process models: An example of strategic. Strategic alliances: a model for establishing long. R., & Hiscocks, E. Coventry Framework Partnership. Proceedings of the. Anvuur, A.

article thumbnail

Revit OpEd: Wall Floor Interaction and Linked Models

Revit OpEd

Wall Floor Interaction and Linked Models. When we have architecture and structure in separate Revit models we end up with somewhat clumsy graphics in wall sections. This is more pronounced if the structural slab is in the structure model only. The issue is the same when interior walls are linked into a shell model.

Revit 53
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Why Projects Fail

Job Order Contracting

The latter includes all internal personnel and departments as well as all external services providers (architects, engineers, contractors, consultants, etc.). There are several maturity models that describe the degree of maturity of an organization and/or associated projects. 2006, Gibson, et al, 1994, Haley). CHANGE MANAGEMENT.

article thumbnail

LEAN Job Order Contracting Intro 4

Job Order Contracting

Owner leadership without excessive reliance upon “JOC consultants” Focus upon best value outcomes. ASSET LIFE-CYCLE MODEL – Total Cost of Ownership Management – A framework for facilities life-cycle management. Building Information Modelling BIM in the Construction Industry – Technical Report TR-1405.

Contract 100
article thumbnail

Revit OpEd: BIM Coordinator for Civil 3D and Revit

Revit OpEd

Autodesk Labs posted an application that was developed by Autodesk Consulting. Note that it uses a file formatted as ACCSXML (Autodesk Consulting Coordinate System eXtensible Markup Language). Revit Consultant - Revit Training, Revit Implementation and Navisworks I started using Revit at work in 2002. My Loyal Readers!

Revit 80
article thumbnail

Revit OpEd: Delete Sheets In Browser or Schedules

Revit OpEd

Rooms and areas can be deleted in model views like floor plans and ceiling plans. Revit warns us that they have been deleted from the model but they are still listed in schedules. Wall Floor Interaction and Linked Models. Ive been a freelance Revit consultant since 2005. Revit 2013 Downloads - Please Hold. Other Links.

Revit 56
article thumbnail

My three biggest blunders (and what I’ve learned from them)

Construction Marketing Ideas

We had no substantive controls or processes within the business as it spiralled out of growth control in 2002-2006. The issue: Our sales model, based on supply chain relationships, had become disconnected from any sense of community or respect for the actual clients. Advertisers were rejecting our business.