Remove 2002 Remove Modeling Remove Site
article thumbnail

Characteristics of Strategic Collaboration and Efficient Construction Project Delivery

Job Order Contracting

Conceptual model of partnering and alliancing. Development of a practical model of partnering for construction. Application of ANP in process models: An example of strategic. Strategic alliances: a model for establishing long. R., & Hiscocks, E. Coventry Framework Partnership. Proceedings of the. Anvuur, A.

article thumbnail

Revit OpEd: Wall Floor Interaction and Linked Models

Revit OpEd

Wall Floor Interaction and Linked Models. When we have architecture and structure in separate Revit models we end up with somewhat clumsy graphics in wall sections. This is more pronounced if the structural slab is in the structure model only. The issue is the same when interior walls are linked into a shell model.

Revit 53
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Why Projects Fail

Job Order Contracting

There are several maturity models that describe the degree of maturity of an organization and/or associated projects. The various capability maturity models (CMM) can be applied to virtually any industry or market segment. Performance Evaluation Model for Project Managers Using Managerial Practices?, CHANGE MANAGEMENT.

article thumbnail

Michael G. Smith Writes about the Value of Cob

Natural Building

For example, many builders harvest clay soil from the building site during the leveling and excavation process, then use it to build the house. The International Residential Code, the model code used as the basis for building codes in 49 of the 50 United States, now includes appendices on both straw bale and light straw clay construction.

article thumbnail

Maryland Bans Polystyrene and Enacts 31 other New Environmental Laws

Green Building Law Update

In 2014 the legislature established the original “Coast Smart” siting and design criteria requirements including created a Coast Smart Council. The bill also delays the implementation date of the Coast Smart siting and design criteria that are modified and made more broadly applicable from July 1, 2019, to July 1, 2020. Forest Cover.

Maryland 120
article thumbnail

Our 2022 Builder of the Year, Van Metre Homes, Is Wired for Change

Pro Builder

or its design center, model homes, or 80,000-square-foot component manufacturing facility, and you’ll sense something very different about this builder. To the vast majority of builders still stick-building on site, those hurdles are daunting, at best; even Sandkuhler calls it a big leap. Is Now the Time for Off-Site Construction?

Housing 98
article thumbnail

Revit OpEd: Delete Sheets In Browser or Schedules

Revit OpEd

Rooms and areas can be deleted in model views like floor plans and ceiling plans. Revit warns us that they have been deleted from the model but they are still listed in schedules. Site Information. Any reference to Revit, Revit Architecture, Revit MEP or Revit Structure on this site is made acknowledging this ownership.

Revit 56